Knowledge Check: Integrated Planning

Test your ability to weave together scope, schedule, cost, and resource baselines for the 2026 PMP exam.

Chapter 6: Planning

Question 1 of 5
20%
A Project Manager is leading a predictive project and the team is confused about the technical requirements of a work package. Which document should they refer to?
A. The Project Scope Statement
B. The WBS Dictionary
C. The Product Backlog
D. The Quality Management Plan

Additional Study Topics

For full Chapter 6 proficiency, ensure you can:

  1. Calculate Float: Determining which tasks are "Critical."
  2. Estimate PERT: Using the Beta distribution for uncertainty.
  3. Evaluate Leveling: Understanding the trade-off between resource limits and schedule dates.
  4. Audit the WBS: Ensuring the 100% rule is followed.

📝 Exam Insight: If a planning document is "Drafted," it is not yet a **Baseline**. A plan only becomes a baseline after it is formally approved by the Sponsor or Change Control Board.