Appearance
Knowledge Check: Integrated Planning
Test your ability to weave together scope, schedule, cost, and resource baselines for the 2026 PMP exam.
Chapter 6: Planning
Question 1 of 5
20%
A Project Manager is leading a predictive project and the team is confused about the technical requirements of a work package. Which document should they refer to?
Additional Study Topics
For full Chapter 6 proficiency, ensure you can:
- Calculate Float: Determining which tasks are "Critical."
- Estimate PERT: Using the Beta distribution for uncertainty.
- Evaluate Leveling: Understanding the trade-off between resource limits and schedule dates.
- Audit the WBS: Ensuring the 100% rule is followed.
📝 Exam Insight: If a planning document is "Drafted," it is not yet a **Baseline**. A plan only becomes a baseline after it is formally approved by the Sponsor or Change Control Board.